US$ 40.99
(Previously a build option in the now-discontinued B-17E/F kit ref PKHK01E05)
meaning that the top half is produced as a plastic injection moulding
where the shutters could allow trains to enter to make the unit into an EMU/DMU/Diesel Depot
Create a timber tunnel portal over a single N scale track
All Grain Dryer parts are molded in an appropriate base color and complete instructions are provided
376-226A LNER Thompson Composite Corridor BR Crimson & Cream E1230E Class_Class 88 (Previously a build option inEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
US$ 40.99
US$ 150.00
US$ 20.00